Inspired by the very similar thread about school incidents.

  • rekabis@lemmy.ca
    link
    fedilink
    arrow-up
    5
    ·
    3 months ago

    Buried lines of all kinds are frequently severed by excavators because their position isn’t properly or fully documented.

    The best set up I ever saw was a sewer tunnel, almost 12 feet tall, that handled all the services. From sewage to water to electricity to data; it held everything and was trivial to maintain and run new lines in.

    • artemisRiverborne@lemmy.world
      link
      fedilink
      arrow-up
      2
      ·
      3 months ago

      line sounds like a really interesting idea, although I feel like documenting where you put things should be a basic task. Probably why it’s not done properly