• knexcar@lemmy.world
    link
    fedilink
    English
    arrow-up
    1
    ·
    9 months ago

    Was it 100 million per mile for the entire thing, or just 100 million per mile to expand it by a lane?

    • psud@lemmy.world
      link
      fedilink
      English
      arrow-up
      5
      ·
      9 months ago

      I believe it was the widening project, +1 lane each way for 100M per mile, probably including acquiring what used to be high density residential buildings